|
|
|
|
 |
FPL has provided traffic engineering plans (traffic signals,
signing and striping, traffic control/handling,
and CCTV), street lighting/electrical
plans, and civil engineering plans for
numerous projects under the City of Los Angeles’s
"on-call" Bridge Improvement Program (BIP).
FPL’s traffic engineering plans were
reviewed by LADOT; street lighting plans
were reviewed and approved by LABSL; civil
engineering plans were reviewed and approved by BOE. FPL also coordinates with LADWP for BOE-managed bridge improvement projects managed
by BOE.
- 1st Street viaduct idening over Los Angeles River traffic
studies and traffic design to accommodate the Eastside Light Rail Transit
- La Tijera Boulevard at I-405b ridge widening and interchange improvements:
traffic and lighting design
- Overland Avenue at I-10 bridge widening and intrchange improvements:
traffic and lighting design
- Soto Street at Valley Boulevard bridge widening: traffic design and traffic study
- State Street at I-5 traffic Design
- Tampa Avenue bridge widening over Los Angeles River: civil, traffic, and
lighting design, as well as lighting plan for bike lane along Los Angeles River
- Riverside Drive viaduct replacement over Los Angeles River: traffic, civil, and
utility design
|
|
| |
|
|